*Please note that the links to the content in this Part will direct you to Westlaw AU.

To purchase an article, please email: [email protected] or contact us on 1300 304 195 (Australian customers) or +61 2 8587 7980 (international customers) during business hours (Mon-Fri, 8am-6pm AST).

The latest issue of the Building and Construction Law Journal (Volume 38 Part 4) contains the following material:

EDITORIALEditor: Michael Christie SC

  • Expert Witness Reports and Clarity of Expression

BOOK REVIEW

  • Contracts for Infrastructure Projects: An International Guide to Application, by Phillip Loots and Dr Donald Charrett Reviewed by Dr Richard Manly KC

Articles

The Decommissioning Difference: Unique Challenges in Contracting for Decommissioning Projects – Trevor Thomas and Thomas Milner

This article considers the unique challenges involved in contracting for decommissioning projects. In contrast to construction projects, where there are a wide range of standard form contracts and well-established practices, decommissioning projects suffer from a lack of uniformity in approach. This issue is likely to become more acute having regard to the immense future pipeline of decommissioning work, driven by the impending retirement of a wave of ageing assets and accelerated by the early shutdown of fossil fuel infrastructure in response to climate change. This article sheds light on seven key contractual issues that are likely to arise in decommissioning projects and offers guidance to contracting parties on how to navigate the key differences between construction and decommissioning when preparing and negotiating a form of decommissioning contract.

(Dis)Proportionate Liability, Insurance and the Design and Building Practitioners Regulation 2021 (NSW) – Jordan Davies

In the wake of the Building Confidence Report to the Building Ministers Forum, the New South Wales (NSW) Legislature passed sweeping reforms to plug perceived holes in the NSW building regulatory scheme. These reforms included substantial new obligations for design and building practitioners under the Design and Building Practitioners Act 2020 (NSW). This article investigates the interaction of these reforms with the NSW scheme of proportionate liability under the Civil Liability Act 2002 (NSW) and the insurance requirements for design and building practitioners in the jurisdiction. It aims to determine whether the NSW Legislature has appropriately accounted for unintended risks to consumers arising from broadening the range of practitioners “captured” by liability under the Design and Building Practitioners Act 2020 (NSW) and Design and Building Practitioners Regulation 2021 (NSW).

REPORTS

For the PDF version of the table of contents, click here: New Westlaw Australia – BCL Vol 38 No 4 Contents.

Click here to access this Part on New Westlaw AU

For general queries, please contact: [email protected].